Custom humidification system solution for outdoor storage
We expanded and adapted the previously installed air humidification system at the Barrus AS glulam plant for a new three-zone warehouse building. In each zone separated by curtains or doors, a stable and high humidity level of 80% RH is ensured, keeping wet sawn timber in optimal conditions before it is directed to the kiln. The piping is insulated and equipped with an automatic heating cable that activates automatically near the freezing point.


The project challenge
In the new three-zone warehouse building, the client wanted to ensure a stable and high humidity level of 80% RH in each zone, separated by curtains or doors. Such a system is essential to keep the stored wet sawn timber in optimal conditions before it is directed to the kiln, and to prevent premature drying of the material. In addition, the winter cold had to be taken into account, which can create a freezing risk in the piping.
How we built the solution
We developed a plan that would meet the client's requirements, including customised humidification zones that enable spraying primarily from top to bottom, creating a uniform humidity coverage for each storage area.
Three separate humidification zones (separated by curtains or doors) Spraying from top to bottom to ensure uniform humidity coverage Insulated piping against the winter cold Automatic heating cable that activates near the freezing point Control system inside the building
Automation and remote management
The client chose the interior of the building as the location for the control system, which ensures easy access and efficient monitoring of the system. The piping heating cable activates immediately when the temperature in the piping is near the freezing point – nothing needs to be switched on manually.
The result
The solution ensures that the humidity level does not fall below 80% RH, meeting the client's need to maintain the material's moisture before it moves to the kiln. The positive experience with the operating principle and results of the previous system gave the client confidence to expand the same approach to the new premises.
Video
Galerii
FAQ
Frequently asked questions
What humidity level does the system maintain?
How is humidification handled across multiple warehouse zones?
How is pipe freezing prevented in winter?
Does the system need to be operated manually?
Can an existing humidification system be extended to new spaces?
Projects
More similar projects
Tarmeko LPD new production building humidification system – old and new together
We installed a five-zone Unifog high-pressure humidification system in Tarmeko LPD's new production building, combining new solutions with equipment partially transferred from the old production facility. Both pipe-type and UFO-type humidification solutions are in use, and the entire system is controlled by a single touchscreen control centre with data logging. In addition, we equipped the press room with the necessary ventilation.
UNIFOG humidification system for glulam production
We installed a 1-zone UNIFOG humidification system in the production facilities of Timbeco Woodmill to ensure a consistent and optimal humidity level in the manufacturing of glulam. In addition, we installed a water softening system that keeps maintenance costs almost non-existent and ensures the long-term efficiency of the system. The system is expandable to the rest of the production facilities.
UNIFOG pipe humidification modernization in a woodworking plant – 16 zones
For a North Estonian timber industry company, we modernized the entire factory's humidification into a UNIFOG pipe-type humidification system. The system consisted of 16 humidification zones and was one of the largest solutions we have supplied. The control panel was installed in the technicians' room, and the system is practically maintenance-free. The installation took a total of three weeks.