← Back
Industrial VentilationTartumaa2021

Baltic Connexions production facility's modern ventilation system

For Baltic Connexions, a manufacturer of wooden garden houses and sheds, we supplied a new spray automation system and compensation ventilation with a heat exchanger for the drying oven. The automatic system adjusts air volumes itself according to the operating load of the equipment, keeping the working environment clean without separate management. In addition, a WOLF gas boiler was installed, providing thermal energy for both the drying oven and the ventilation unit.

ClientBaltic Connexions OÜ
Baltic Connexions production facility's modern ventilation system

Project challenge

The new spraying machine and drying oven required a production environment where air exchange operates automatically and the working environment stays clean without separate manual management. The solution had to meet the needs of the new production technology and ensure a clean working environment for employees.

How we built it

Elister supplied compensation ventilation with a heat exchanger for the spraying machine and drying oven, and also installed a gas boiler providing thermal energy in the production building. From an engineering perspective, the key decision was to link the ventilation automation directly to the production equipment, so that the system monitors the operation of the connected equipment and adjusts air volumes in real time according to the equipment's workload – without separate management.

  • Compensation ventilation with a heat exchanger
  • WOLF gas boiler providing thermal energy to both the drying oven and the ventilation unit
  • Ventilation automation for automatic adjustment of air volumes according to the equipment's workload

What we achieved

  • A modern and automatic ventilation system that keeps the employees' working environment clean
  • Automatic adjustment of air volumes according to the equipment's workload – the system operates without separate management
  • WOLF gas boiler covers the thermal energy needs of both the drying oven and the ventilation unit
  • The principle of production automation is consistently implemented throughout the solution

Galerii

FAQ

Frequently asked questions

Does the ventilation system require manual management?
No. The ventilation automation is connected directly to the production equipment and adjusts airflow in real time according to the equipment's workload without separate management.
Which gas boiler was used in the solution and what does it heat?
A WOLF gas boiler was used, providing thermal energy both to the drying kiln and to the ventilation unit.
What kind of ventilation solution was installed for the spraying machine and drying kiln?
A compensation ventilation system with a heat exchanger was installed, tailored to the needs of the new production technology.
How does the system ensure a clean working environment for employees?
The modern, automatic ventilation system keeps the working environment clean by automatically adjusting air exchange according to the equipment's operation.
Can the ventilation be integrated with production equipment?
Yes. In this project the ventilation automation was connected directly to the production equipment, so the system monitors the connected devices and adjusts airflow in real time.
Sarnane väljakutse?Räägime, kuidas saame aidata.
Request a quote →