For a returning customer, we manufactured wider manual finishing booths with a drying tunnel as well as specialized pump cabinets for paint pumps, into which safety leak trays were integrated. The solution was designed as a 3D model according to the customer's requirements, and in addition to the booths and pump cabinets, we organized all partition walls, doors, and finishing technology. The result was a fast and seamless implementation and a satisfied customer who received exactly the solution they wanted.

The project challenge
The client wanted wider paint booths than in the previous project, as well as special pump cabinets for the paint pumps, with safety leakage trays already integrated into them. As most of the technical details had already been discussed and resolved during the previous project, the main challenge lay in fast delivery and precise execution.
How we built the solution
In line with the client's wishes, we quickly prepared a 3D model, which provided an accurate overview of the updated solution. Based on this, production could soon begin, and the entire process went smoothly and without setbacks. In addition to the main equipment, we also organised all the accessories needed to complete the project.
Wider manual finishing booths together with a drying tunnel Special pump cabinets for the paint pumps, with integrated safety leakage trays Partition walls and doors Finishing technology
The result
The result was yet another successful project and a satisfied client, who received exactly the solution they had wanted. The similarity to the previous project and the repeat cooperation confirmed that we had made the right choices in both execution and customer service.
Galerii
FAQ
Frequently asked questions
Can you build wider hand-finishing booths than in previous projects?
What do the pump cabinets for paint pumps include?
How do you ensure an accurate overview of the solution before production?
Do you also supply the additional components needed to complete the project?
Can you offer fast delivery for repeat solutions?
Projects
More similar projects
Manual finishing department: two paint booths and a drying tunnel
We established a dedicated manual finishing department for a long-term client to produce custom orders. We installed two 3-metre-wide finishing booths, six finishing pumps, a drying tunnel, and in-house manufactured GRINO drying trolleys. To ensure worker safety, we added barriers and fast-opening doors that separate the finishing area from the rest of production. The new department operates flawlessly and successfully fulfils all custom orders.
Renovation of a Door Manufacturer's Finishing Workshop – MAKOR Automatic Line and Manual Finishing Booth
An automatic finishing solution, MAKOR SPRAY & DRY – M, was designed and installed for a Central Estonian door manufacturer, together with a manual finishing booth built by Elister. The heart of the finishing process consisted of GRACO PerformAA automatic paint guns with Merkur-series pumps, and the ventilation was interfaced directly with the Makor system, which detects the operating equipment and adjusts the working modes. The entire system was designed, installed and commissioned into working order precisely during the factory's collective holiday, resulting in an energy-efficient and safe finishing environment.
Relocation of the fully automatic Cefla spraying line from Tallinn to Võru
We relocated the fully automatic Cefla finishing line from Askala's former premises to Wermo's new production hall in Võru. At the client's request, we rebuilt the line during the relocation and turned it 180 degrees in the opposite direction of operation, which required reconstructing the drying multi-level oven in mirror image. The work began in September, and the first start-up took place already in early November.