← Back
Küte ja jahutusPeetri2025

Reconstruction of the gas boiler houses of Peetri Kindergarten-Basic School

We carried out a complete renovation of the gas boiler rooms in the buildings of Peetri Kindergarten-Basic School, installing new WOLF MGK-2-210 gas boilers in a cascade system – 3 boilers in the school building and 2 boilers in the kindergarten. The boilers were integrated with the existing building automation, enabling smart and energy-efficient control. The cascade solution ensures operational reliability: in the event of a failure or maintenance of one boiler, the others continue operating without interruption.

ClientRae Vallavalitsus
Reconstruction of the gas boiler houses of Peetri Kindergarten-Basic School

The project challenge

The existing gas boiler rooms in the school and kindergarten buildings needed modernisation. The heating system had to meet the daily needs of the educational institution and provide a warm and comfortable learning environment for children and teachers year-round. It was essential to achieve both energy efficiency and high reliability.

How we built the solution

Our team carried out a complete renovation of the boiler rooms along with all the necessary piping and connections. The new heating boilers were installed in a cascade system and integrated with the existing building automation and control systems.

WOLF MGK-2-210 gas boilers in a cascade system 3 gas boilers installed in the school building 2 gas boilers installed in the kindergarten All the necessary piping and connections

Automation and remote management

The new boilers were integrated with the existing building automation and control systems, enabling smart control and energy-efficient operation of the heating system.

Result

The school and kindergarten received a modern, economical and more environmentally friendly heating system that ensures a warm and comfortable learning environment year-round. The cascade solution ensures reliability – if one boiler requires maintenance or a fault occurs, the other boilers continue to operate without interruptions.

Galerii

FAQ

Frequently asked questions

What boilers were installed?
We installed WOLF MGK-2-210 gas boilers in a cascade system — 3 in the school and 2 in the kindergarten.
What advantage does the cascade solution give?
The cascade solution ensures reliability: if one boiler fails or needs service, the others keep working without interruption.
How are the boilers controlled?
The boilers were connected to the existing building automation and control systems, enabling smart, energy-efficient control.
What did the reconstruction involve?
We carried out a full renovation of the boiler rooms including all necessary piping and connections.
Sarnane väljakutse?Räägime, kuidas saame aidata.
Request a quote →