Energy-efficient welding ventilation
Kraanavabrik OÜ sought to resolve the issue of welding fumes spreading throughout their production facility and to obtain a modern, energy-efficient solution. We installed a local exhaust solution with welding fume extraction arms, controlled via "Smart" plugs. The system automatically activates the filter unit when welding begins and adjusts the power according to the number of actively operating welders, ensuring energy savings.


The Project Challenge
Kraanavabrik's initial concern was the welding fume spreading throughout production and the desire for a modern, energy-efficient solution. Two welding stations were already in daily use, to which an additional welding station was added.
How We Built It
Since the welding was fairly localised, a local extraction solution with welding arms was suitable here. With this, we used smart "Smart" plugs that link the operation of the filter unit to the actual activity of the welders. The first workstation to start working automatically activates the filter unit, and when no one is welding anymore, it switches off. When not all welders are working at a given time, the filter operates at a capacity corresponding to the number of actively welding employees.
- local extraction solution with welding arms
- "Smart" plugs for automatic control
- a total of 3 welding stations
What We Achieved
- modern and energy-efficient welding ventilation
- the production environment remains clean of welding fume
- the system operates only when needed and at precisely the required capacity
- automatic start-up when welding begins and shut-down when work ends
- capacity regulation according to the number of active welders, which reduces energy consumption
Galerii
FAQ
Frequently asked questions
What ventilation solution was installed for Kraanavabrik?
How does the system save energy?
Does the system start and stop automatically?
What problem did this solution solve?
Can the system be expanded with additional welding stations?
Projects
More similar projects
Welding hall ventilation solution with smart remote management
We built a push-pull general ventilation system for the welding hall with two separately controlled zones, ensuring a total air circulation of up to 60,000 m³/h (the requirement was ≥45,000 m³/h) and over 10,000 m³/h of fresh air. We installed two GRAM 364DH double cyclones with 45 kW fans and a C.I.C Jan Hrebec plate heat exchanger with water heating, which reduces heating demand. Compliance of air quality with health protection limit values was confirmed by measurements carried out together with the Health Board, and the entire system is controlled by a single control panel with real-time remote management.
Push-Pull welding ventilation for a metal production hall in Saue
At a metalworking company's production hall in Saue, we solved the blue welding fume problem using the Push-Pull method, as the use of welding arms was not possible due to the large components and continuous crane operation. We installed an FL series filter with GRAM welding cartridges, prepared a 3D piping installation drawing, and carried out the installation. The filtered air is directed into the hall from floor level, and the welding fumes are extracted from above the workstation, beneath the ceiling.
Factory Welding Workshop Push-Pull Ventilation
We upgraded the ventilation of the manual welding stations at Sami Tootmine's Valga factory in two areas, each with 10 workstations. We installed cyclone filters together with fans from the Danish manufacturer Gram Clean Air and designed a push-pull ventilation system with air calculations. We integrated automation that activates the filter system only when welding is actually taking place, ensuring energy savings and a clean working environment. In addition, we helped find a suitable welding filter for the robotic welding area.