Eldur Puit Increased Production Capacity with New Painting and Drying Room

We designed an electrically heated painting and drying room based on a plate heat exchanger, along with a preparation area featuring two walls (height 1 m, total length 6 m), for the Pärnu-based wood processor Eldur Puit OÜ. The solution enables the painting of both smaller components and longer cladding boards, ensuring faster drying of products even as summer-period volumes increase. The result is a well-lit, heated and ventilated painting room that shortens the entire workflow and boosts productivity.

ClientEldur Puit OÜ
Eldur Puit Increased Production Capacity with New Painting and Drying Room

The project challenge

The company needed to paint both smaller components and longer cladding boards while ensuring rapid drying of the products in both cases. In addition, the new finishing solution had to enable the processing of wood parts in larger volumes than usual, as the summer period typically brought an increase in production.

How we built it

We designed an electrically heated painting and drying room based on a plate heat exchanger. The entire new finishing section was planned within an existing uninsulated steel structure building with Sandwich panels, which features wide motorised overhead doors to simplify logistics.

  • Electrically heated painting and drying room, based on a plate heat exchanger
  • Preparation room with two walls: height 1 metre, total length 6 metres
  • Wide motorised overhead doors in both areas
  • Installation in an uninsulated steel structure building with Sandwich panels

What we achieved

  • A well-lit and heated, ventilated painting room
  • Significantly faster drying of products
  • A shorter overall workflow thanks to logistics
  • Markedly increased productivity
  • Both rooms are of sufficient size even for an increase in seasonal work volumes

Galerii

FAQ

Frequently asked questions

What type of heating does the paint and drying room built for Eldur Puit use?
The room uses electric heating and is based on a plate heat exchanger. This solution ensures significantly faster drying of products.
How large is the preparation room?
The preparation room has two walls with a height of 1 meter and a total length of 6 meters. Both rooms are large enough to handle seasonal increases in workload.
Is the solution suitable for painting both smaller parts and longer cladding boards?
Yes, the solution allows painting both smaller parts and longer cladding boards while ensuring fast drying in both cases. The rooms are large enough for higher production volumes as well.
How is logistics and material movement handled in the rooms?
Both areas have wide motorized lifting doors that simplify logistics. This shortens the entire work chain by improving logistics.
What results did the project deliver for Eldur Puit?
The company gained a well-lit and heated ventilated painting room, significantly faster drying, and a shorter work chain. The result was a noticeably increased productivity.

Projects

More similar projects

Vedelvärvimine2024

Manual finishing booths with drying tunnel and pump cabinets

For a returning customer, we manufactured wider manual finishing booths with a drying tunnel as well as specialized pump cabinets for paint pumps, into which safety leak trays were integrated. The solution was designed as a 3D model according to the customer's requirements, and in addition to the booths and pump cabinets, we organized all partition walls, doors, and finishing technology. The result was a fast and seamless implementation and a satisfied customer who received exactly the solution they wanted.

Vedelvärvimine2023

Manual finishing department: two paint booths and a drying tunnel

We established a dedicated manual finishing department for a long-term client to produce custom orders. We installed two 3-metre-wide finishing booths, six finishing pumps, a drying tunnel, and in-house manufactured GRINO drying trolleys. To ensure worker safety, we added barriers and fast-opening doors that separate the finishing area from the rest of production. The new department operates flawlessly and successfully fulfils all custom orders.

VedelvärvimineKesk-Eesti · 2026

Renovation of a Door Manufacturer's Finishing Workshop – MAKOR Automatic Line and Manual Finishing Booth

An automatic finishing solution, MAKOR SPRAY & DRY – M, was designed and installed for a Central Estonian door manufacturer, together with a manual finishing booth built by Elister. The heart of the finishing process consisted of GRACO PerformAA automatic paint guns with Merkur-series pumps, and the ventilation was interfaced directly with the Makor system, which detects the operating equipment and adjusts the working modes. The entire system was designed, installed and commissioned into working order precisely during the factory's collective holiday, resulting in an energy-efficient and safe finishing environment.

Sarnane väljakutse?Räägime, kuidas saame aidata.