Factory Welding and General Ventilation Upgrade
We upgraded the welding and general ventilation at the factory of Metagrupp, a manufacturer of welded aluminium products, and built a custom-designed separate system for the cooling units of the lasers. In the enclosed welding booths, we utilised the existing ductwork and added a GRAM filter unit, while the general ventilation was addressed with a CIC unit. The result is fresh air reaching the workers, normal air circulation and an energy-efficient solution that is ready for process automation and integration with other machines.

Galerii
FAQ
Frequently asked questions
What equipment did you use for the welding and general ventilation?
Does the solution work on hot days too?
Is there a separate solution for the laser cooling units?
Can the systems be further developed or automated in the future?
Was the existing infrastructure reused in the solution?
Projects
More similar projects
Extraction and filtration solution for metalworking benches serving 8 workstations
We designed and installed an extraction and filtration solution for a metalworking shop where 8 machine tools generated haze and emulsion in the air. Each machine was fitted with an OUF centrifugal oil separator and a shared GRAM CLEAN AIR filter FL 104, which returns the cleaned air back into production. The system starts based on the machine tools' signal and ensures cleaner room air and healthier working conditions.
Cooling Tunnels – Automated Component Cooling for the Stator Production Line
At AS Konesko's new Türi-Alliku factory, we built two dedicated cooling tunnels that cool the stator components exiting the heating furnace to the desired temperature within a maximum of one hour. The tunnels' forced-cooling fans are connected to the control automation via frequency converters, which measure the component's surface temperature and continuously adjust the operating speed of the blowers using an algorithm. The solution accounts for varying component mass and fluctuating ambient temperature, ensuring a faster and more stable production process.
LEGUAN factory ventilation
Elister calculated and installed heat-recovery fresh air ventilation for the production hall, which the previous welding solution with filter towers did not include. The work covered design, measurements, as well as a turnkey solution.