C.I.C. Jan Hřebec manufactures air handling units for industrial ventilation. Elister's range includes the H and HL series, the H-UNI with heat pump, and roof-mounted H-TOP units.

The unit brings fresh air into the building and recovers heat from the exhaust air. We have used these units in ventilation solutions for paint lines and production halls — view our completed projects.

Request a quote

Projects

Projects with C.I.C. Jan Hřebec equipment

Liquid paintingJärvamaa · 2021

Taikse Puit Finishing Room Major Renovation with Energy-Efficient Ventilation

We carried out a comprehensive upgrade of the finishing room at furniture manufacturer Taikse Puit OÜ. Clean air is now ensured by an energy-efficient ventilation system based on a plate heat exchanger, complemented by a solvent sensor for automatic system control and to ensure safety. Finishing quality is improved by the GRACO Merkur finishing kit together with the G40 finishing gun.

Heat RecoveryJärlepa · 2021

Heat energy recovery from paint lines

We installed a heat recovery ventilation unit on one of the spraying lines at Harviker OÜ's furniture factory, capturing thermal energy from the air exhausted by the finishing machine and drying oven and using it to preheat the supply air. The system operates automatically, monitoring the volume of exhausted air and the vacuum in the factory with pressure sensors. In addition, we assisted in setting up the drying oven previously procured by the client and carried out the installation and connection of the heating water pipelines.

Heat RecoveryTartu · 2021

Heat Recovery Ventilation and Air Exchange System

For Lasita Maja's new Makor coating line, we implemented efficient heat recovery and factory air compensation. We installed two units with an air exchange rate of 25,000 m³/h, which, according to our calculations, required no heating section, and completed all overhead air ducting above the ovens. The system operates automatically and monitors the working process using pressure sensors, ensuring trouble-free operation of the line's equipment.

Liquid paintingKarjavere · 2020

Semi-automatic wet painting line for the new production building

We installed a liquid paint line for painting openings' fillers in Saku Metall's new production building, based on a semi-automatic conveyor system with a lifting section of up to 500 kg and 20 booms (spacing 350 mm). The water-heated ventilation units of the paint room and drying tunnel are heated by an autonomous gas boiler, and the entire line is controlled by a Siemens touchscreen control panel. Safety is ensured by solvent sensors, which automatically activate the ventilation, as well as Atex zone 1 luminaires. Two GRACO Merkur 48:1 high-pressure paint pumps were installed for painting.

Industrial Ventilation2026

Production Welding Hall Ventilation

Elister calculated and installed heat-recovery fresh air ventilation for the production hall, which the previous welding solution with filter towers did not include. The work covered design, measurements, as well as a turnkey solution.

FAQ

Frequently asked questions

Why is heat recovery important in industry?
Large volumes of air are exchanged in production. Without heat recovery, all the heated warmth would be lost with the outgoing air — the unit recovers a large portion of it and reduces heating costs.
What is the difference between the H-UNI and H-TOP model?
H-UNI additionally uses a heat pump, which also provides cooling capability. H-TOP is installed on the roof when there is no space in the building.