Aabo-Ideal pesutunnelid - Elister

Aabo-Ideal washing tunnels

In spray pre-treatment or tunnel pre-treatment, the product passes through a tunnel, providing a series of steps to prepare the product for processing. These steps are specifically designed for each type of object or product.

As such, the design of the tunnel pre-treatment is tailored to the product, dictating the number and length of steps required. Temperatures and materials are also carefully taken into account.

AABO-IDEAL pre-treatment systems are insulated to prevent condensation and reduce heat loss.

Ask for a quote

At AABO-IDEAL, we offer a range of tunnel washing solutions where the final technical solution is based on what the customer's production actually needs.

  • fixated washdowns
  • the washer nozzles are fixed with quick-locking clips
  • vertically recessed centrifugal pumps
  • fully welded stainless steel washing tunnel
  • fully insulated tunnel and liquid tanks
  • water-saving solution
  • automatic level control different heating options (gas, oil, electricity, direct heating)
  • maintenance-friendly design
  • motors comply with IEC standards
  • there are neutral zones between each washing zone
  • operator maintenance floor in the tunnel
  • ventilated solution
FeatureValue
PumpsAll pumps are ultra-efficient, installed in submersible tanks and made of acid-resistant steel.
EnginesAll motors are 100% IEC standard without modifications and very simple to use if required.