The client wanted a comprehensive overview of their production aspiration solution. All the equipment was connected behind a single filter, which was causing low air velocity in several workstations and consequent problems in the production process. The piping was being built out gradually as new equipment was added and there was no project documentation reflecting the actual situation. The aim was to map the whole system, check the air velocities, calculate the air requirements and distribute the equipment between the two filters to ensure a reliable and efficient aspiration solution.
A comprehensive set of documents is handed over to the client, including a detailed piping diagram, measured air velocities and any other data required for future use.
In the course of the project, we drew the entire aspiration piping with the necessary calculations. A large number of old lines were removed and replaced with new piping that was in line with the design. Unnecessary penetrations were closed and the equipment was distributed between the two filters according to their importance. Following the installation work, measurements were carried out to check that the system was in accordance with the design.
Any ideas that could be reviewed together? Contact us
Come and visit us at our Jüri office at Kesk tee 10, Jüri, Rae vald, Estonia