Keevitusnurga terviklahendus, ventilatsioon, valgustus, turvalisus - Elister

Welded corner solution, ventilation, lighting, security

Made

2025

Purpose

The client wanted to build effective and working welding ventilation "corner of the fire". The previous solution of two separate fan coils offered only a limited radius of operation and did not cover the entire area. A comprehensive solution was needed that would provide a safe working environment, ensure adequate ventilation and take into account lighting and containment needs.

Solution

We designed and installed a complete solution to ensure the desired result.

The open area was enclosed by a specially designed structure to which curtains suitable for welding were attached. In addition, both the ventilation pipework and the light fittings were fixed to the structure. For the ventilation, we combined a welded cage solution and a ventilation system. Push-Pull a system that prevents welding gases from spreading to the rest of the building, even without the use of a handle. The core of the ventilation system was GRAM FL 104 filter tower with manual control, to which we added a automatically managed by Welding head type RFF. As a lighting solution, we installed high quality VYRTYCH luminaires, the quantity of which was determined on the basis of light calculations. The result is an efficient and complete welding angle solution.

Image gallery

See more

Contact us

Any ideas that could be reviewed together? Contact us

Or come and visit us

Come and visit us at our Jüri office at Kesk tee 10, Jüri, Rae vald, Estonia

Customers speak